Detailed engineering for the construction of the new CW24/14″ RC3 NAHY saturated gases 2

  • ENI
  • Detail Engineering
  • Taranto
  • 2016

Feasibility study to adapt cooling circuit 6-cell Bis for the plants RC-3 NAHY, Saturated Gases, 2 in order to assess the possibility of installing new cooling water collectors (round trip) on an existing structure.

Oil & Gas

Gallery

 data-rellax-speed=
 data-rellax-speed=
 data-rellax-speed=

Similar projects

Go to Case Histories

Entrust your project to our team of high qualified professionals
Contact Us